← All HVAC tools

FREE TOOL / MAINTENANCE PREPARATION

The filter order.
The belt list.
Ready for the next visit.

Build a commercial HVAC materials list by unit, combine matching specifications for your supplier, and give the crew a clear picking list. Free, with no account required.

Supplier order totalsUnit-by-unit picking listCSV & printable copies
01 / PREPARE THE VISIT

Bring the right materials to each unit.

Enter the replacements planned for this visit. Use one entry per filter or belt specification on a unit. Add another entry if that unit needs a second size.

Open a draft from the equipment register to bring across tags and locations. We create a blank filter entry per unit for you to complete or remove. No sizes, ratings or quantities are guessed.

Your plan is recovered when you return in this browser tab. Download an editable draft before closing the tab; no account is needed.

03 / ORDER & LOAD

One order. A clear list for the van.

Add a filter or belt to start your list.

How to prepare an HVAC filter and belt list

Start with the equipment scheduled for the visit. For each unit, record the filter size, rating or product requirement, and the number being replaced. Add the full belt specification and quantity when belts are part of the planned work.

The planner makes two outputs: a supplier order combining matching materials, and a picking list that keeps each item with its equipment tag and location. Your crew can see where the materials belong without working backward from the order total.

Example: two units, one filter order

If RTU-01 needs four filters and RTU-02 needs two filters with the same size and product specification, the supplier order shows six. The picking list still shows four for RTU-01 and two for RTU-02. A different MERV rating or product entry stays on a separate order line.

Can I start with my equipment register?

Yes. Save a draft from our free equipment-register builder, then open it here. Tags and locations carry across. Each unit starts with a blank filter entry for you to complete or remove; add belt entries only where needed.

Does it look up filter sizes or belt replacements?

No. Use verified equipment records, the installed item and manufacturer documentation to establish the required specification. The planner organizes the materials you enter; it does not infer dimensions, recommend a MERV rating or establish replacement compatibility.

Which items are combined?

Material type, specification and rating/product must match. The planner ignores capitalization and repeated spaces, but does not convert units or equate different size notation. Use consistent entries for the same product and keep nominal versus actual dimensions explicit.

Can I use the list again next quarter?

Download the editable draft and reopen it before the next visit. Update the equipment and planned replacements, then review the list again before exporting. Your text entries are temporarily kept in this tab’s browser storage so you can navigate away and return. Download a draft before closing the tab. No customer or equipment data is uploaded by this planner.

Open your saved planner draft in the maintenance agreement estimator to price the visit.

What about other maintenance tasks?

Use the commercial RTU maintenance checklist to prepare the rest of the visit. This materials list does not certify that equipment was inspected or that maintenance was completed.